Introduction
Infrastructure
Team of Executives
Captive Mines

Maihar Cement has its own Captive Mines with rich limestone reserves at Bhadanpur just 7 Kms from the plant.  Mines working is fully mechanized and an overland belt conveyor of 7 kms passing through hilly terrain transports limestone from mines to plant.  The aesthetic view of the surrounding area has been maintained by afforestation of the mining area and also by creating water reservoir in the excavated area.
A Panaromic view of Mines
Captive Thermal Power Plant

To meet the need of the hour and in order to reduce the cost of production, so as to be competitive, Maihar Cement has installed its own Captive Thermal Power Plant and the total  installed capacity is 35 MW which is helpful in uninterrupted running of the plants on sustainable basis.
View of Power Plant from Back Side
Logistics

Strategic location of the plant, connected with NH-7 puts Maihar Cement in a very advantageous position so far as logistics is concerned.  The Plant is well connected by Road with all the major marketing centers.  Being situated on Mumbai - Howrah (via Allahabad) main Railway Line, it is also well connected with all the States in East & North East.
| Century Cement
|  Manikgarh Cement
|Century Textiles |
Back To Home
|  Century Rayon
|    Century Pulp & Paper
|Legal Disclaimer   |
©Copyright 2009 CTIL (Cement Business Group).  All Rights Reserved.
This site is best viewed with an 1024 x 768 monitor resolution

About  Us
View of Railway Siding